{"id":6721,"date":"2026-07-29T08:18:44","date_gmt":"2026-07-29T01:18:44","guid":{"rendered":"https:\/\/datkhucongnghiep247.com.vn\/en\/?p=6721"},"modified":"2026-07-29T08:18:44","modified_gmt":"2026-07-29T01:18:44","slug":"tan-phuoc-1-industrial-park","status":"publish","type":"post","link":"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/","title":{"rendered":"Tan Phuoc 1 Industrial Park: A VND 5.936 Trillion Project Set to Break Ground in Dong Thap"},"content":{"rendered":"<p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"675\" data-end=\"1211\"><strong data-start=\"675\" data-end=\"711\">Tan Phuoc 1 Industrial Park (IP)<\/strong> is emerging as one of Vietnam&#8217;s most anticipated industrial infrastructure developments, with construction expected to begin in <strong data-start=\"840\" data-end=\"858\">September 2026<\/strong>. Featuring a <strong data-start=\"872\" data-end=\"924\">total investment of more than VND 5.936 trillion<\/strong>, a planned area of <strong data-start=\"944\" data-end=\"960\">470 hectares<\/strong>, and a strategic location connecting Southern Vietnam with the Mekong Delta, the project is expected to become a major catalyst for industrial growth, logistics development, and both domestic and foreign direct investment (FDI) in Dong Thap Province.<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-6722\" src=\"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-content\/uploads\/2026\/07\/6e4fb879-fc61-4d63-8741-5ad215839526.png\" alt=\"tan-phuoc-1-industrial-park.webp\" width=\"675\" height=\"450\" srcset=\"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-content\/uploads\/2026\/07\/6e4fb879-fc61-4d63-8741-5ad215839526.png 1536w, https:\/\/datkhucongnghiep247.com.vn\/en\/wp-content\/uploads\/2026\/07\/6e4fb879-fc61-4d63-8741-5ad215839526-768x512.png 768w, https:\/\/datkhucongnghiep247.com.vn\/en\/wp-content\/uploads\/2026\/07\/6e4fb879-fc61-4d63-8741-5ad215839526-510x340.png 510w\" sizes=\"auto, (max-width: 675px) 100vw, 675px\" \/><\/p><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_81 ez-toc-wrap-center counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">M\u1ee4C L\u1ee4C<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#1_Total_Investment_Exceeds_VND_5936_Trillion\" >1. Total Investment Exceeds VND 5.936 Trillion<\/a><ul class='ez-toc-list-level-2' ><li class='ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#2_A_470-Hectare_Industrial_Park_in_a_Strategic_Location\" >2. A 470-Hectare Industrial Park in a Strategic Location<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#3_Groundbreaking_Scheduled_for_September_2026\" >3. Groundbreaking Scheduled for September 2026<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#4_Land_Clearance_Progress_Is_Advancing_Smoothly\" >4. Land Clearance Progress Is Advancing Smoothly<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#Phase_1\" >Phase 1<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#Phase_2\" >Phase 2<\/a><\/li><\/ul><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#5_Modern_Transportation_Infrastructure_Is_Being_Developed\" >5. Modern Transportation Infrastructure Is Being Developed<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#6_Excellent_Highway_and_Inland_Waterway_Connectivity\" >6. Excellent Highway and Inland Waterway Connectivity<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#7_A_New_Growth_Engine_for_FDI_and_Industrial_Development\" >7. A New Growth Engine for FDI and Industrial Development<\/a><ul class='ez-toc-list-level-2' ><li class='ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#Future_Outlook_for_Tan_Phuoc_1_Industrial_Park\" >Future Outlook for Tan Phuoc 1 Industrial Park<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#Conclusion\" >Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-1'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/tan-phuoc-1-industrial-park\/#Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" >Free access to exclusive information on warehouse, factory, and land rentals in Dong Nai, Binh Duong, Long An, Ho Chi Minh City, and more.<\/a><\/li><\/ul><\/nav><\/div>\n\n<hr data-start=\"1213\" data-end=\"1216\" \/>\n<h1 data-section-id=\"pe3833\" data-start=\"1218\" data-end=\"1266\"><span class=\"ez-toc-section\" id=\"1_Total_Investment_Exceeds_VND_5936_Trillion\"><\/span>1. Total Investment Exceeds VND 5.936 Trillion<span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p data-start=\"1268\" data-end=\"1402\">Tan Phuoc 1 Industrial Park is among the largest industrial infrastructure projects currently under development in Dong Thap Province.<\/p>\n<p data-start=\"1404\" data-end=\"1437\">Key project information includes:<\/p>\n<ul data-start=\"1439\" data-end=\"1682\">\n<li data-section-id=\"12ppu6j\" data-start=\"1439\" data-end=\"1495\"><strong data-start=\"1441\" data-end=\"1462\">Total investment:<\/strong> More than <strong data-start=\"1473\" data-end=\"1495\">VND 5.936 trillion<\/strong><\/li>\n<li data-section-id=\"nwy099\" data-start=\"1496\" data-end=\"1558\"><strong data-start=\"1498\" data-end=\"1533\">Investor&#8217;s equity contribution:<\/strong> Over <strong data-start=\"1539\" data-end=\"1558\">VND 896 billion<\/strong><\/li>\n<li data-section-id=\"1vuqlf1\" data-start=\"1559\" data-end=\"1612\"><strong data-start=\"1561\" data-end=\"1575\">Developer:<\/strong> IDICO Tien Giang Joint Stock Company<\/li>\n<li data-section-id=\"1mlm6t0\" data-start=\"1613\" data-end=\"1682\"><strong data-start=\"1615\" data-end=\"1636\">Project duration:<\/strong> 50 years from the date of investment approval<\/li>\n<\/ul>\n<p data-start=\"1684\" data-end=\"1852\">The project aims to develop and operate a modern industrial park with high-quality technical infrastructure capable of attracting manufacturers from various industries.<\/p>\n<hr data-start=\"1854\" data-end=\"1857\" \/>\n<h2 data-section-id=\"hq0no5\" data-start=\"1859\" data-end=\"1917\"><span class=\"ez-toc-section\" id=\"2_A_470-Hectare_Industrial_Park_in_a_Strategic_Location\"><\/span>2. A 470-Hectare Industrial Park in a Strategic Location<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"1919\" data-end=\"2010\">The industrial park covers <strong data-start=\"1946\" data-end=\"1962\">470 hectares<\/strong> in <strong data-start=\"1966\" data-end=\"2009\">Tan Phuoc 3 Commune, Dong Thap Province<\/strong>.<\/p>\n<p data-start=\"2012\" data-end=\"2063\">Its location offers several competitive advantages:<\/p>\n<ul data-start=\"2065\" data-end=\"2277\">\n<li data-section-id=\"1t1dnza\" data-start=\"2065\" data-end=\"2097\">Large industrial land reserves<\/li>\n<li data-section-id=\"lh9m8g\" data-start=\"2098\" data-end=\"2125\">Room for future expansion<\/li>\n<li data-section-id=\"6j29uu\" data-start=\"2126\" data-end=\"2190\">Convenient access to Southern Vietnam&#8217;s major economic centers<\/li>\n<li data-section-id=\"u10a0p\" data-start=\"2191\" data-end=\"2277\">Ideal conditions for manufacturing, processing industries, and supporting industries<\/li>\n<\/ul>\n<p data-start=\"2279\" data-end=\"2378\">The project is expected to become one of Dong Thap&#8217;s flagship industrial parks in the coming years.<\/p>\n<hr data-start=\"2380\" data-end=\"2383\" \/>\n<h1 data-section-id=\"5ishoy\" data-start=\"2385\" data-end=\"2433\"><span class=\"ez-toc-section\" id=\"3_Groundbreaking_Scheduled_for_September_2026\"><\/span>3. Groundbreaking Scheduled for September 2026<span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p data-start=\"2435\" data-end=\"2554\">According to the Dong Thap Economic Zone Authority, construction is expected to officially begin in <strong data-start=\"2535\" data-end=\"2553\">September 2026<\/strong>.<\/p>\n<p data-start=\"2556\" data-end=\"2601\">The current implementation schedule includes:<\/p>\n<ul data-start=\"2603\" data-end=\"2871\">\n<li data-section-id=\"171m8l1\" data-start=\"2603\" data-end=\"2695\">Site groundbreaking and technical infrastructure construction before <strong data-start=\"2674\" data-end=\"2695\">September 2, 2026<\/strong><\/li>\n<li data-section-id=\"xuwxrt\" data-start=\"2696\" data-end=\"2871\">An official groundbreaking ceremony combined with investment promotion activities is expected to take place in <strong data-start=\"2809\" data-end=\"2822\">late 2026<\/strong>, once major preparation work has been completed.<\/li>\n<\/ul>\n<p data-start=\"2873\" data-end=\"3011\">This timeline demonstrates the developer&#8217;s commitment to accelerating project implementation and welcoming investors as early as possible.<\/p>\n<hr data-start=\"3013\" data-end=\"3016\" \/>\n<h1 data-section-id=\"17fqrac\" data-start=\"3018\" data-end=\"3068\"><span class=\"ez-toc-section\" id=\"4_Land_Clearance_Progress_Is_Advancing_Smoothly\"><\/span>4. Land Clearance Progress Is Advancing Smoothly<span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p data-start=\"3070\" data-end=\"3140\">Land acquisition and site clearance have achieved encouraging results.<\/p>\n<h3 data-section-id=\"1ho4yig\" data-start=\"3142\" data-end=\"3153\"><span class=\"ez-toc-section\" id=\"Phase_1\"><\/span>Phase 1<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul data-start=\"3155\" data-end=\"3445\">\n<li data-section-id=\"1y96lgv\" data-start=\"3155\" data-end=\"3214\">Approximately <strong data-start=\"3171\" data-end=\"3187\">360 hectares<\/strong> have been largely cleared.<\/li>\n<li data-section-id=\"ebntl\" data-start=\"3215\" data-end=\"3299\">Compensation and obligations to local residents have been substantially completed.<\/li>\n<li data-section-id=\"85b0kn\" data-start=\"3300\" data-end=\"3385\">Remaining work primarily involves land lease procedures and official land handover.<\/li>\n<li data-section-id=\"2nf444\" data-start=\"3386\" data-end=\"3445\">Only about <strong data-start=\"3399\" data-end=\"3416\">10 households<\/strong> have yet to reach agreement.<\/li>\n<\/ul>\n<h3 data-section-id=\"1ho4yij\" data-start=\"3447\" data-end=\"3458\"><span class=\"ez-toc-section\" id=\"Phase_2\"><\/span>Phase 2<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul data-start=\"3460\" data-end=\"3560\">\n<li data-section-id=\"1nawoo3\" data-start=\"3460\" data-end=\"3496\">Site clearance is nearly complete.<\/li>\n<li data-section-id=\"8fpydf\" data-start=\"3497\" data-end=\"3560\">Only <strong data-start=\"3504\" data-end=\"3520\">2 households<\/strong> remain due to internal family disputes.<\/li>\n<\/ul>\n<p data-start=\"3562\" data-end=\"3671\">Overall, the land clearance process has created favorable conditions for construction to proceed on schedule.<\/p>\n<hr data-start=\"3673\" data-end=\"3676\" \/>\n<h1 data-section-id=\"1qubvie\" data-start=\"3678\" data-end=\"3738\"><span class=\"ez-toc-section\" id=\"5_Modern_Transportation_Infrastructure_Is_Being_Developed\"><\/span>5. Modern Transportation Infrastructure Is Being Developed<span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p data-start=\"3740\" data-end=\"3838\">Alongside the industrial park itself, IDICO is investing heavily in transportation infrastructure.<\/p>\n<p data-start=\"3840\" data-end=\"3877\">Current infrastructure works include:<\/p>\n<ul data-start=\"3879\" data-end=\"4062\">\n<li data-section-id=\"20utdt\" data-start=\"3879\" data-end=\"3908\">A <strong data-start=\"3883\" data-end=\"3896\">222-meter<\/strong> access road<\/li>\n<li data-section-id=\"qacuny\" data-start=\"3909\" data-end=\"3954\">A <strong data-start=\"3913\" data-end=\"3927\">33.9-meter<\/strong> bridge crossing Nang Canal<\/li>\n<li data-section-id=\"5uwqsq\" data-start=\"3955\" data-end=\"4007\">Total route length of approximately <strong data-start=\"3993\" data-end=\"4007\">256 meters<\/strong><\/li>\n<li data-section-id=\"1i64c2d\" data-start=\"4008\" data-end=\"4062\">Total investment of approximately <strong data-start=\"4044\" data-end=\"4062\">VND 85 billion<\/strong><\/li>\n<\/ul>\n<p data-start=\"4064\" data-end=\"4278\">According to the project schedule, both the bridge and access road are expected to achieve <strong data-start=\"4155\" data-end=\"4215\">technical opening by late October or early November 2026<\/strong>, significantly improving regional transportation connectivity.<\/p>\n<hr data-start=\"4280\" data-end=\"4283\" \/>\n<h1 data-section-id=\"iv25v3\" data-start=\"4285\" data-end=\"4340\"><span class=\"ez-toc-section\" id=\"6_Excellent_Highway_and_Inland_Waterway_Connectivity\"><\/span>6. Excellent Highway and Inland Waterway Connectivity<span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p data-start=\"4342\" data-end=\"4453\">One of Tan Phuoc 1 Industrial Park&#8217;s strongest competitive advantages is its multimodal transportation network.<\/p>\n<p data-start=\"4455\" data-end=\"4524\">The project enjoys convenient access to major expressways, including:<\/p>\n<ul data-start=\"4526\" data-end=\"4624\">\n<li data-section-id=\"1ojq7xi\" data-start=\"4526\" data-end=\"4590\">Ho Chi Minh City \u2013 Trung Luong \u2013 My Thuan \u2013 Can Tho Expressway<\/li>\n<li data-section-id=\"1lnorqk\" data-start=\"4591\" data-end=\"4624\">Ben Luc \u2013 Long Thanh Expressway<\/li>\n<\/ul>\n<p data-start=\"4626\" data-end=\"4721\">In addition, the industrial park will feature an <strong data-start=\"4675\" data-end=\"4696\">inland water port<\/strong>, allowing businesses to:<\/p>\n<ul data-start=\"4723\" data-end=\"4863\">\n<li data-section-id=\"jexuh6\" data-start=\"4723\" data-end=\"4757\">Transport cargo more efficiently<\/li>\n<li data-section-id=\"1ydcdlv\" data-start=\"4758\" data-end=\"4782\">Reduce logistics costs<\/li>\n<li data-section-id=\"18z02dv\" data-start=\"4783\" data-end=\"4825\">Improve connectivity with major seaports<\/li>\n<li data-section-id=\"11v9mo0\" data-start=\"4826\" data-end=\"4863\">Strengthen supply chain performance<\/li>\n<\/ul>\n<p data-start=\"4865\" data-end=\"4982\">This combination of road and waterway infrastructure offers substantial advantages for export-oriented manufacturers.<\/p>\n<hr data-start=\"4984\" data-end=\"4987\" \/>\n<h1 data-section-id=\"t9n0nm\" data-start=\"4989\" data-end=\"5048\"><span class=\"ez-toc-section\" id=\"7_A_New_Growth_Engine_for_FDI_and_Industrial_Development\"><\/span>7. A New Growth Engine for FDI and Industrial Development<span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p data-start=\"5050\" data-end=\"5111\">Once operational, Tan Phuoc 1 Industrial Park is expected to:<\/p>\n<ul data-start=\"5113\" data-end=\"5403\">\n<li data-section-id=\"ln8e9d\" data-start=\"5113\" data-end=\"5161\">Attract high-quality foreign direct investment<\/li>\n<li data-section-id=\"izm9yq\" data-start=\"5162\" data-end=\"5210\">Expand manufacturing and processing industries<\/li>\n<li data-section-id=\"acv2pj\" data-start=\"5211\" data-end=\"5272\">Strengthen industrial supply chains across the Mekong Delta<\/li>\n<li data-section-id=\"wekl2f\" data-start=\"5273\" data-end=\"5319\">Create thousands of employment opportunities<\/li>\n<li data-section-id=\"y6s4ij\" data-start=\"5320\" data-end=\"5357\">Increase provincial budget revenues<\/li>\n<li data-section-id=\"u2n7sc\" data-start=\"5358\" data-end=\"5403\">Support logistics and supporting industries<\/li>\n<\/ul>\n<p data-start=\"5405\" data-end=\"5522\">The project is expected to significantly enhance Dong Thap&#8217;s competitiveness as an industrial investment destination.<\/p>\n<hr data-start=\"5524\" data-end=\"5527\" \/>\n<h2 data-section-id=\"s01kut\" data-start=\"5529\" data-end=\"5577\"><span class=\"ez-toc-section\" id=\"Future_Outlook_for_Tan_Phuoc_1_Industrial_Park\"><\/span>Future Outlook for Tan Phuoc 1 Industrial Park<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p data-start=\"5579\" data-end=\"5788\">As global manufacturers continue expanding production in Vietnam, industrial parks with modern infrastructure, strategic transportation links, and abundant industrial land are becoming increasingly attractive.<\/p>\n<p data-start=\"5790\" data-end=\"5997\">With its large development scale, excellent regional connectivity, and integrated transportation infrastructure, Tan Phuoc 1 Industrial Park is expected to become an ideal destination for industries such as:<\/p>\n<ul data-start=\"5999\" data-end=\"6131\">\n<li data-section-id=\"ctpr48\" data-start=\"5999\" data-end=\"6014\">Manufacturing<\/li>\n<li data-section-id=\"sx3i73\" data-start=\"6015\" data-end=\"6038\">Processing industries<\/li>\n<li data-section-id=\"ibt1kr\" data-start=\"6039\" data-end=\"6062\">Supporting industries<\/li>\n<li data-section-id=\"1hzzzll\" data-start=\"6063\" data-end=\"6076\">Electronics<\/li>\n<li data-section-id=\"153jqbe\" data-start=\"6077\" data-end=\"6101\">Mechanical engineering<\/li>\n<li data-section-id=\"1hwkct7\" data-start=\"6102\" data-end=\"6113\">Logistics<\/li>\n<li data-section-id=\"1j8padc\" data-start=\"6114\" data-end=\"6131\">High technology<\/li>\n<\/ul>\n<p data-start=\"6133\" data-end=\"6262\">The project is expected to become one of Dong Thap Province&#8217;s key industrial development drivers during the <strong data-start=\"6241\" data-end=\"6254\">2026\u20132030<\/strong> period.<\/p>\n<hr data-start=\"6264\" data-end=\"6267\" \/>\n<h1 data-section-id=\"fsb6xx\" data-start=\"6269\" data-end=\"6281\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span>Conclusion<span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p data-start=\"6283\" data-end=\"6839\">The upcoming groundbreaking of <strong data-start=\"6314\" data-end=\"6345\">Tan Phuoc 1 Industrial Park<\/strong>, featuring <strong data-start=\"6357\" data-end=\"6389\">more than VND 5.936 trillion<\/strong> in investment, <strong data-start=\"6405\" data-end=\"6421\">470 hectares<\/strong> of industrial land, and comprehensive transportation infrastructure, marks an important milestone in Dong Thap Province&#8217;s industrial development strategy. Upon completion, the project will expand the province&#8217;s supply of high-quality industrial land, attract both domestic and international investors, stimulate economic growth, and strengthen Dong Thap&#8217;s position as a major industrial hub in Vietnam&#8217;s Mekong Delta.<\/p>\n<p data-start=\"5726\" data-end=\"5748\"><strong data-start=\"5726\" data-end=\"5746\">References:<\/strong><\/p>\n<ul data-start=\"5749\" data-end=\"5903\">\n<li data-section-id=\"qg9xo1\" data-start=\"5749\" data-end=\"5815\">\n<p data-start=\"5751\" data-end=\"5815\"><a class=\"decorated-link\" href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\" target=\"_new\" rel=\"noopener\" data-start=\"5751\" data-end=\"5813\">Dat Khu C\u00f4ng Nghi\u1ec7p 247<\/a><\/p>\n<\/li>\n<\/ul>\n<h1><span class=\"ez-toc-section\" id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><span id=\"Free_access_to_exclusive_information_on_warehouse_factory_and_land_rentals_in_Dong_Nai_Binh_Duong_Long_An_Ho_Chi_Minh_City_and_more\" class=\"ez-toc-section\"><\/span><strong>Free access to exclusive information on warehouse, factory, and land rentals in Dong Nai, Binh Duong, Long An, Ho Chi Minh City, and more.<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h1>\n<p><a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\"><strong>KHU C\u00d4NG NGHI\u1ec6P 247\u00a0<\/strong><\/a>is a company operating in the field of buying, selling, and leasing factories and real estate<strong>.<\/strong>.\u00a0<a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\">We<\/a>\u00a0are proud to be a leading provider of real estate services in Vietnam. We have a team of highly qualified and experienced real estate consultants who always place trust and credibility at the core of everything we do<a href=\"https:\/\/jsc-vietnam.com\/khu-che-xuat-la-gi-vai-tro-va-loi-ich\/\" target=\"_blank\" rel=\"noopener\">.<\/a><\/p>\n<p><strong>Phone:<\/strong>\u00a0<strong>0901 490 348<\/strong><\/p>\n<p><strong>Email:\u00a0<\/strong>datkhucongnghiep247@gmail.com<\/p>\n<p><strong>Website:\u00a0<\/strong><a href=\"https:\/\/datkhucongnghiep247.com.vn\/en\/\">datkhucongnghiep247.com.vn<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tan Phuoc 1 Industrial Park (IP) is emerging as one of Vietnam&#8217;s most anticipated industrial infrastructure developments, with construction expected to begin in September 2026. Featuring a total investment of more than VND 5.936 trillion, a planned area of 470 hectares, and a strategic location connecting Southern Vietnam with the Mekong Delta, the project is [&#8230;]\n","protected":false},"author":12,"featured_media":6722,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6721","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"_links":{"self":[{"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/posts\/6721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/comments?post=6721"}],"version-history":[{"count":1,"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/posts\/6721\/revisions"}],"predecessor-version":[{"id":6723,"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/posts\/6721\/revisions\/6723"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/media\/6722"}],"wp:attachment":[{"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/media?parent=6721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/categories?post=6721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/datkhucongnghiep247.com.vn\/en\/wp-json\/wp\/v2\/tags?post=6721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}